IASS 2017 Hamburg - Interfaces - The structure of the Grand Théâtre de Rabat @ AKTII from digital design to local fabrication

IASS 2017 Hamburg - Interfaces - The structure of the Grand Théâtre de Rabat @ AKTII from digital design to local fabrication

The World's Footbridges for Berlin, Jovis, Brommy New Footbridge

The World's Footbridges for Berlin, Jovis, Brommy New Footbridge

Rhino Users Meeting - UDK BERLIN 05/102017 - TRANSITIONS AKTII/SPANS associates

Rhino Users Meeting - UDK BERLIN 05/102017 - TRANSITIONS AKTII/SPANS associates

Ideas for a MANIFESTO

Ideas for a MANIFESTO

The Morning Line, TBA21

The Morning Line, TBA21

UED 037, 2010

UED 037, 2010

The Arup Journal 2010 Issue 2

The Arup Journal 2010 Issue 2

Bulletin Ouvrages Métalliques 6, 2010

Bulletin Ouvrages Métalliques 6, 2010

Arkitepo 45, 2010

Arkitepo 45, 2010

Bulletin Ouvrages Métalliques 4. 2005

Bulletin Ouvrages Métalliques 4. 2005

Lecture, bridging, Parametric Prototypes, 2009 Xian, China, Nicolas Sterling, ARUP AGU

Lecture, bridging, Parametric Prototypes, 2009 Xian, China, Nicolas Sterling, ARUP AGU

Monocle, issue 25, 2009, ARUP Building the dream

Monocle, issue 25, 2009, ARUP Building the dream

Greenwich School Architecture, London, UK

Greenwich School Architecture, London, UK

Pretectonic constructs, Staedel Schule, Frankurt, Germany

Pretectonic constructs, Staedel Schule, Frankurt, Germany

FRAME, jan./feb. 2009

FRAME, jan./feb. 2009